Commercial & Industrial Electrical Contractor · Phoenix, AZ

Engineered power for Arizona industry

Switchgear, plant power, service upgrades and CNC machine installation. Ethernet cabling, video security and fire alarm on the low voltage side. One contractor that only does commercial and industrial work.

Ask MJK AI assistant · cites the 2017 NEC · sends messages to our team
  • LicenseAZ ROC #363113 (CR-11)
  • CoverageBonded & insured
  • Response24/7 emergency service
  • Scope100% commercial & industrial
01Who we are

We’re not a residential service company trying to scale up. MJK Electric is built from the ground up for industry.

We understand the stakes of downtime and the precision heavy manufacturing demands. From 4000A switchgear deployments to precision PLC integrations, our work defines reliability in Arizona’s harshest environments.

We install the low voltage side too: Ethernet cabling, digital video security and fire alarm, planned and run alongside the power.

We’re based in north Phoenix and work across Phoenix, Glendale, Peoria, Scottsdale, New River, Paradise Valley and Buckeye.

About MJK
  • 4000ASwitchgear deployments
  • 3000A+Service changeovers in active facilities
  • 24/7Emergency response
  • AZExclusively Arizona based
02Capabilities All services

One line.
Every load.

From the service entrance to the spindle. Every job starts as a one-line diagram, and so does this one: four feeders off the main bus, and a transformer down to the low voltage side.

03Ask MJK

A code desk
that never closes.

Ask an electrical question the way you’d ask a journeyman. Our assistant searches the 2017 National Electrical Code and tells you which section the answer came from, so you can check it yourself. It can also send a message to our team for you, any hour of the day.

  • A

    Cited, not guessed

    Code answers come from the NEC text and name the section, table or definition.

  • B

    High voltage to low voltage

    Switchgear, transformers, motors and VFDs, controls, data, fire alarm and lighting.

  • C

    Sends your message to our team

    Need a quote or a callback? Give it your name, your email and what you need. It sends the message straight to our inbox, and a person replies.

Ask MJK Sample

How deep does PVC conduit have to be buried under a parking lot?

Searched the 2017 NEC

24 inches of cover. PVC and other nonmetallic raceways normally need 18 in. of cover, but under streets, highways, roads, alleys, driveways and parking lots the minimum is 24 in.

That’s the 2017 edition. Your city may be on a different one, and the inspector has the final say.

NEC 2017 Table 300.5
Electrician walking a switchgear aisle in an industrial electrical room
3000A+ Service changeovers in active manufacturing facilities, planned for no unplanned downtime.
04Working in live facilities

Your plant
keeps running.

Most industrial work happens in buildings that are already running. We plan it that way from the start.

  1. 01

    Outages on your schedule

    We map which loads are affected, sequence the work, and schedule outages for your planned downtime, weekends or off-shifts.

  2. 02

    Phased upgrades

    Larger upgrades are broken into stages so production keeps moving between them.

  3. 03

    Safety by procedure

    Lockout/tagout and work practices that follow OSHA requirements and NFPA 70E, for our crew and yours.

  4. 04

    A clear record

    Labeled equipment, updated panel schedules and a clear record of what changed.

Industrial capabilities
05Phoenix metro & all of Arizona

Arizona heat is an
electrical problem.

High ambient temperatures in Valley shops and on rooftops affect conductor sizing, and enclosures packed with drives and power supplies can overheat in summer. We account for derating and enclosure cooling so equipment that ran fine in January doesn’t start faulting in July.

Start a project

Ready to power up?

Tell us about your project. We provide detailed, transparent estimates for commercial and industrial scope.

Prefer to type it out? .