Commercial & Industrial Electrical Contractor · Phoenix, AZ
Engineered power for Arizona industry
Switchgear, plant power, service upgrades and CNC machine installation. Ethernet cabling, video security and fire alarm on the low voltage side. One contractor that only does commercial and industrial work.
- LicenseAZ ROC #363113 (CR-11)
- CoverageBonded & insured
- Response24/7 emergency service
- Scope100% commercial & industrial
We’re not a residential service company trying to scale up. MJK Electric is built from the ground up for industry.
We understand the stakes of downtime and the precision heavy manufacturing demands. From 4000A switchgear deployments to precision PLC integrations, our work defines reliability in Arizona’s harshest environments.
We install the low voltage side too: Ethernet cabling, digital video security and fire alarm, planned and run alongside the power.
We’re based in north Phoenix and work across Phoenix, Glendale, Peoria, Scottsdale, New River, Paradise Valley and Buckeye.
About MJK- 4000ASwitchgear deployments
- 3000A+Service changeovers in active facilities
- 24/7Emergency response
- AZExclusively Arizona based
One line.
Every load.
From the service entrance to the spindle. Every job starts as a one-line diagram, and so does this one: four feeders off the main bus, and a transformer down to the low voltage side.
Low Voltage & Digital
Power makes a building run. Low voltage is how it talks, watches and warns. We install both, so the pathways are planned once.
All low voltage
A code desk
that never closes.
Ask an electrical question the way you’d ask a journeyman. Our assistant searches the 2017 National Electrical Code and tells you which section the answer came from, so you can check it yourself. It can also send a message to our team for you, any hour of the day.
-
A
Cited, not guessed
Code answers come from the NEC text and name the section, table or definition.
-
B
High voltage to low voltage
Switchgear, transformers, motors and VFDs, controls, data, fire alarm and lighting.
-
C
Sends your message to our team
Need a quote or a callback? Give it your name, your email and what you need. It sends the message straight to our inbox, and a person replies.
How deep does PVC conduit have to be buried under a parking lot?
24 inches of cover. PVC and other nonmetallic raceways normally need 18 in. of cover, but under streets, highways, roads, alleys, driveways and parking lots the minimum is 24 in.
That’s the 2017 edition. Your city may be on a different one, and the inspector has the final say.
NEC 2017 Table 300.5
Your plant
keeps running.
Most industrial work happens in buildings that are already running. We plan it that way from the start.
- 01
Outages on your schedule
We map which loads are affected, sequence the work, and schedule outages for your planned downtime, weekends or off-shifts.
- 02
Phased upgrades
Larger upgrades are broken into stages so production keeps moving between them.
- 03
Safety by procedure
Lockout/tagout and work practices that follow OSHA requirements and NFPA 70E, for our crew and yours.
- 04
A clear record
Labeled equipment, updated panel schedules and a clear record of what changed.
Arizona heat is an
electrical problem.
High ambient temperatures in Valley shops and on rooftops affect conductor sizing, and enclosures packed with drives and power supplies can overheat in summer. We account for derating and enclosure cooling so equipment that ran fine in January doesn’t start faulting in July.
Based in north Phoenix. Serving
Start a project
Ready to power up?
Tell us about your project. We provide detailed, transparent estimates for commercial and industrial scope.